FAQ
Projects
Location:
Home > Projects > Classic Case

Tunnel Segment Bolts for Indonesia High Speed Railway

Jun 04, 2021
The Jakarta-Bandung High-speed Railway in Indonesia connects Jakarta--the capital of Indonesia, and Bandung--the 4th largest city, with a total length of 142 kilometers and a maximum design speed of 350 kilometers per hour. 83% of the total, 13 tunnels on the entire line, using Chinese technology, Chinese standards and Chinese equipment, with a design speed of 250-300 km/hour. After the completion and opening to traffic, the time from Jakarta to Bandung will be shortened to about 40 minutes.
Anyang Railway Equipment Co., Ltd.(AT) provided 50,300 sets of M36 tunnel segment bolts and 2,960 sets sets box culvert connecting bolts for the Jakarta-Bandung High-speed Railway.
Tunnel Segment bolts are the core advantage product of Anyang Railway Equipment Co., Ltd. We are committed to providing customers with high-quality products to ensure the safe construction and progress of the project. Our segment bolts are widely used in railway highway tunnels, urban subways, etc projects.
China Made Tunnel Segment Bolts for Indonesia High Speed Railway

 
Share:
Related Products