FAQ
Projects
Location:
Home > Projects > Classic Case

31500 Sets DT-Ⅲ Fastening System for Shenzhen Metro Line 12

May 15, 2024
The second phase of Shenzhen Metro Line 12 starts from the end of the first phase (the end of the open-cut section of Haitianyuan East Station), and finally has Songgang Station, an interchange station for Metro Line 11 and Metro Line 6. 
The total length of the second phase of Shenzhen Metro Line 12 is about 8.05km (right line), which is laid entirely underground. It has a total of 6 stations, is composed of 6 A-type cars, is powered by DC1500V catenary network, and has a designed maximum driving speed of 80km. /h. .
In 2024, Anyang Railway Equipment Co., Ltd(AT). provided 31,500 sets of DT-III Fastening Systems to the second phase of Shenzhen Metro Line 12. One set of DT-III type fasteners includes: 1 pcs of steel baseplate, 2 pcs of Type III elastic rail clips, 2 pcs of insulators, 1 pcs of elastic pad under the rail, 2 pcs of screw spikes, 2 pcs of flat washers, 2 pcs of heavy-duty spring washers, 2 pcs of adjustable gauge clamps, 1 pcs of elastic pad under the baseplate, 2 pcs of plastic dowels.
Fastening Systems Manufacturer for Shenzhen Metro
Share: