Regular rail joints, Regular insulating rail joints manufacturer

May 15, 2024
The new Dali-Panzhihua railway introducing Dali hub project is located in Dali City, Yunnan Province, including the new Dali North Railway Station project (excluding the Dali North Railway Station building and related passenger transportation facilities project), and the new comprehensive maintenance workshop project; the new Dali North Railway Station, and A new EMU line project of 2.53 km, a simultaneous implementation project of 0.84 km of the Dali-Panzhihua railway introduced into the Hongshan Tunnel of Dali North Station, a new Chu-Dalian Railway Xiajinchang line (inclusive) to Dali North Station (inclusive) section project, and a new main line with the length of 13.23 km; a new connecting line from Chu-Dalian Railway to Dali East Station, with an uplink length of 1.26 kms and a downlink length of 0.49 km; the existing Dali to Lijiang Railway will be reconstructed, with a line length of 2.31 km; the existing Dali Station will be reconstructed to connect with Dali North Station, the line with the length of 0.74 km; the construction period of the operational line (transition project) is 3 years.
In 2024, Anyang Railway Equipment Co., Ltd(AT) provided 700 sets of P60kg/m rail regular rail joints, 3200 sets of P50kg/m rail regular rail joints, 150 sets of P60kg/m rail regular insulating joints, 150 sets of P50kg/m rail regular insulating joints.
The quality standards and technical requirements of ordinary fishplates should comply with the "Technical specifications for the procurement of 43kg/m~75kg/m rails" TB/T 2345-2008.
The quality standards and technical requirements of ordinary insulating plywood should comply with the "Technical specifications for bonded insulating joint of rails" TB/T2975-2018 and the "Technical specifications for the procurement of 43kg/m~75kg/m rails" TB/T 2345-2008.