FAQ
Projects
Location:
Home > Projects > Classic Case

Rail Fastening System for New Lianyungang-Yancheng Railway Project

May 19, 2021
In 2015, Anyang Railway Equipment Co., Ltd(AT) provided fastening system for New Lianyungang-Yancheng Railway Project, the goods included I-type Railway Fastening System for P50 Rail, I-type Railway Fastening System for P60 Rail, II-type Railway Fastening System for P60 Rail, Standard as per TB/T1495, Special Railway Line 3351 etc. 

Lianyungang-Yancheng High-speed Railway, is the Lianyungang-Yancheng High-speed Railway, which is roughly parallel to the Qingyan Railway, connects Qingdao to Lianyungang High-speed Railway in the north, and connects Yantong High-speed Railway in the south. Along the way, it connects with Linlian Intercity Railway, Lianxu High Speed Railway, Lianzhen High Speed Railway, Yantai Xiyi Railway, etc. Among them, the territory of Lianyungang is 142 km. The design speed of the railway is 350 km/h.

China Manufacturer Type II Fastening System for LianYan Railway - Anyang Railway Equipment China Manufacturer Type I Fastening System for LianYan Railway - Anyang Railway Equipment
China Factory Type I Fastening System for LianYan Railway - Anyang Railway Equipment China Factory Type II Fastening System for LianYan Railway - Anyang Railway Equipment
 
Share:
Related Products