Sole Toe Rail Fastening Systems for Guangzhou Metro Line 3

May 28, 2021
Anyang Railway Equipment Co., Ltd(AT) provided sole toe rail clip fastening systems with angle iron plate and adjustable baffles and flat tie plate for 60kg steel rails etc for Guangzhou Subway Line 3.

Guangzhou Metro Line 3 is the third line of Guangzhou Metro completed and put into operation. The first section (Guangzhou East Station to Kecun Station) was opened on December 26, 2005. On December 30, 2006 The first phase of the project (Guangzhou East Railway Station to Panyu Square Station, Tianhe Bus Terminal to Shipaiqiao Station) was opened and operated. On October 30, 2010, the north extension section (Airport South Station to Tiyu West Road Station) was dismantled and opened for operation.
As of November 2020, Guangzhou Metro Line 3 has a total length of 64.41 km, all of which are underground lines; a total of 30 stations are set up, all of which are underground stations; the trains are 6-carriage B-type trains.

sole toe rail clip fastening system for Guangzhou Metro Line 3 - Anyang Railway Equipment
 