FAQ
Projects
Location:
Home > Projects > Classic Case

Rail Fixing Contruction Materials for Chengdu Metro Line 6

May 28, 2021
Anyang Railway Equipment Co., Ltd(AT) provided e-clips of Type DZIII railway rail fastening system, anchor bolts of Type DZIII railway rail fastening system, double coils spring washers of Type DZIII railway rail fastening system etc railway rail fixing construction materials for Chengdu Metro Line 6.

Chengdu Metro Line 6
is the ninth subway line in Chengdu, Sichuan Province, China. The construction of the first and second phases of the project (Wangcongci Station to Guandong Station) started on September 30, 2016. , the construction of the third phase of the project (from Guandong Station to Lanjiagou Station) started on February 27, 2017, and the first, second and third phases of the project were opened on December 18, 2020.
As of December 2020, the length of Chengdu Metro Line 6 is 68.76 km and a total of 56 stations, all of which are underground stations.

e-clips of DZIII rail fastening system for Chengdu Metro Line 6 - Anyang Railway Equipment anchor bolts of DZIII rail fastening system for Chengdu Metro Line 6 - Anyang Railway Equipment
 
Share:
Related Products