FAQ
Projects
Location:
Home > Projects > Classic Case

Rail Fasteners for Dongying Port Shugang Railway

Mar 02, 2022
The Dongying Port Shugang Railway has a total length of 114.24 km. It is connected with the Lijin Station of the Huangda Railway and the Lijin South Station of the Dezhou-Dalian Railway. It reaches Dongying Port via Lijin County, Hekou District, and the comprehensive training base of the Yellow River Delta. The design level is the National Railway Class II freight railway. , the design speed is 100km/h. Among them, the total length of the main line is 96.894km, with 9 stations and 8 sections designed in total; the total length of the connecting line is 17.346km. The construction of the Dongying Port Shugang Railway will greatly improve the transportation capacity of Dongying Port, improve the city's transportation network, stimulate the counties, port industry, logistics industry and related service industries along the line, and promote the economic development of the counties and districts along the line.
In 2019, Anyang Railway Equipment Co., Ltd. provided 1,009,932 M24*195 screw spikes, 1,009,932 pcs of M24 nuts, 1,009,932 pcs of flat washers, 239,612 pcs of A-type track clips, 13316 pcs of B-type track clips, 757004 pcs of P60-II track clips, 119,806 pcs of 14# and 20# intermediate gauge baffles, 6,658 pcs of 14# and 20# joint gauge baffles, 378,502 pcs of 6# and 10# gauge baffles, 21804 pcs of 6-hole railway fish plates for P50 steel rails (according to TB/T 2345-2008 standard).
China Manufacturer Rail Fastener Assembly for Dongying Railway - Anyang Railway Equipment Co., Ltd China Factory Rail Fastener Assembly for Dongying Railway - Anyang Railway Equipment Co., Ltd
China Factroy Rail Fastening Products for Dongying Railway - Anyang Railway Equipment Co., Ltd Track Fastening System for Dongying Railway - Anyang Railway Equipment Co., Ltd
Share: