FAQ
Projects
Location:
Home > Projects > Classic Case

492 pcs of Ф30 insulated gauge tie rods for Chengdu Rail Transit Line 8

Jun 23, 2023
The second phase of the Chengdu Line 8 project is an extension of the first phase of the project. There are two sections of the line, namely the northeast extension (Shilidian Station (not included) ~ Guilong Road Station), the southwest extension (Lianhua Station (not included) ~Longgang Station), the total length of the line is 7.61km, all of which are underground lines. A total of 7 stations are set up on the whole line, the average distance between stations is 1.12km, the maximum distance between stations is 1.34km, and the minimum distance between stations is 0.86km

In 2023, Anyang Railway Equipment Co., Ltd. will provide 492 pcs of Ф30 insulated gauge tie rods to the second phase project of Chengdu Rail Transit Line 8, and carried out the requirements of TB/T 2492-2004.
Insulated gauge tie rods for Chengdu Rail Transit Line 8 - Anyang Railway Equipment


 
 
Share: