17,700 sets of of Fastening Systems for Jiangdu Special Line

Aug 03, 2023
The Jiangdu Special Line is connected to Jiangdu Station of Nanjing–Qidong railway and connects with Coastal corridor and Longhai Passage eastward, which can directly reach Qidong, Huai'an, Lianyungang, Shanghai and other places; It is connected with Hefei–Nanjing railway and Nanjing Wuhu Railway to the west, and can reach Hefei, Wuhu and the northwest.

Jiangdu Station Reconstruction: The station renovation and expansion adopts a truck storage line and a horizontal layout plan of the station. Three new storage lines (including one reserved) are added on the opposite side of Jiangdu Station, one machine waiting line is added at the Nanjing end, and one new lead line is added at the throat of Nantong end.

Track laying project: 5.35 km of track laying on the station line, 12 sets of turnouts, including 2 sets of dismantling, 3 sets of inserting, and 7 sets of pre laying. Dismantle one set of switches and remove 0.243km of the line;

Track laying period: The station yard renovation and expansion project will start on April 1, 2023, and be completed on September 30, 2023.

In 2023, Anyang Railway Equipment Co., Ltd(AT) provide 10500 sets of 60kg/m Type II Fastening Systems, 400 sets of P50 Type I Joint Fastening Systems and 6800 sets of P50 Type I Fastening Systems to Jiangdu Special Line.