FAQ
News
Location:
Home > News

WJ-14 rail fastening systems for Shenzhen Metro Line 14

Jan 20, 2021
Anyang Railway Equipment Co., Ltd. and China Railway 5th Bureau Group signed a supply contract for Shenzhen Metro Line 14 in January 2021, including 90,000 sets of WJ-14 Rail Fastening Systems(rail fasteners).
The total length of the Shenzhen Metro Line 14 project is about 50.34km, with 17 stations, 1 parking lot, 1 depot, and 4 main substations (2 newly built, 1 set for rebuilt, 1 set for reserved).
China Manufacturer WJ-14 rail fastening systems for Shenzhen Metro Line - Anyang Railway Equipment China Factory WJ-14 rail fastening systems for Shenzhen Metro Line - Anyang Railway Equipment
 
Share: