FAQ
Projects
Location:
Home > Projects > Classic Case
ZX-2 Fastening Systems Supplier - Anyang Railway Equipment

89,468 sets of ZX-2 Fastening systems Supplier for Tianjin Metro Line 8

In 2023, Anyang Railway Equipment Co., Ltd. provided 89,468 sets of ZX-2 Fastening systems to the first phase of Tianjin Metro Line 8. The ZX-2 Fastening systems are composed of type II elastic rail clips, iron tie plates, gauge-adjusting buckle plates, bolts, T-bolts, gauge blocks, flat washers, heavy-duty spring washers, lock nuts, plastic dowels, under-rail pads, under rail iron pads, under rail heightening pads.
View More
Normal fishplates, Insulated fishplates, Compromise fishplates  Manufacturer

11,400 pieces Fishplates Supplier to Jinan Bureau Group

In 2023, Anyang Railway Equipment Co., Ltd. provided various joint bars such as normal fishplates, insulated fishplates, compromise fishplates and bulging fishplates, total 11,400 pieces to Jinan Bureau Group Company Zibo Jizhitie Works Track Equipment Manufacturing Co., Ltd.
View More
Cap Nuts, Fishplates  Manufacturer - Anyang Railway Equipment

17,360 Pcs M24 Cap nuts and 420 Pcs regular joint fishplates for Hohhot Railway

In 2023, Anyang Railway Equipment Co., Ltd(AT)provided17,360 Pcs M24 Cap nuts and 420 Pcs regular joint fishplates for 50kg/km steel rails to Hohhot Railway Bureau Hohhot Public Works Section.
View More
Evacuation Platform Manufacturer for Metro  Manufacturer - Anyang Railway Equipment

1,580 Pcs of Evacuation Platform to the Shanghai Rail Transit Municipal Line Airport Link

In 2023, Anyang Railway Equipment Co., Ltd. provided 1,580 Pcs of 6.06m*1.05m evacuation platform to the Shanghai Rail Transit Municipal Line Airport Link Project, which is made of polymer composite materials.
View More
DJK5-1 fastening systems Manufacturer - Anyang Railway Equipment

8,000 sets of DJK5-1 fastening systems supplier to the Shenyang Metro Line 1

In 2023, Anyang Railway Equipment Co., Ltd provided 8,000 sets of DJK5-1 fastening systems to the Shenyang Metro Line 1 East Extension Line Mantang Parking Lot and the Line 1 Thirteenth Street Vehicle Base Renovation and Expansion Project.
View More
 Type-III separate fastening systems manufacturer - Anyang Railway Equipment

30,116 sets of 60kg/m Type-III separate fastening systems for Changsha Rail Transit Line 2 West Extension Line Phase II Rail Project

In 2023, Anyang Railway Equipment Co., Ltd(AT) provided 30,116 sets of 60kg/m Type-III separate fastening systems and 500 pcs of Type-III Elastic Rail Clips to Changsha Rail Transit Line 2 West Extension Line Phase II Rail Project, and carried out Type-III Fastening systems: Q/CR 565-2017 standard.
View More
 2 3 4 5 6 7 8 9 10 11